Home / Rates
RatesHow freight rates are built
There is no public rate table on this site, because a freight rate is specific to the lane, the freight class, the weight and the handling. What we publish is the basis: the formula the quote uses, the fixed accessorial amounts, and the stored-quote data on our own quote history where the sample is large enough to show (medians withheld below n=5).
Published quote basis
| Mode | Basis (published on /trust) |
|---|---|
| LTL | $145 base + $0.62/road mile + $0.045/lb + $18/pallet, adjusted by NMFC class density factor, plus 18% fuel surcharge. |
| Truckload (FTL) | $2.35/road mile, $575 minimum, weight adjustment above 20,000 lb. |
| Flatbed | $2.85/road mile, $575 minimum, tarping and securement quoted up front. |
| Intermodal | $185 base + $0.52/road mile + weight and pallet handling, plus 18% fuel surcharge. |
| Drayage | $325 base + $1.45/road mile for port and rail terminal moves; no separate fuel surcharge. |
| Mileage | ZIP geocoding with a 1.17 road factor; exact addresses can change the final rate. |
| Fuel | 18% surcharge shown inside the quote, not added later. |
These are this site's own published planning assumptions, not market benchmarks. The rate confirmation is the contract for a specific load.
Fixed accessorial amounts
Handling is priced up front from a fixed table, not quoted after delivery. The exact dollar amount for your shipment appears in the quote and on the rate confirmation.
| Handling | Pricing |
|---|---|
| Liftgate at pickup/delivery | $95 |
| Residential / limited access | $110 |
| Appointment window | $45 |
| Inside delivery | $65 |
| Hazmat handling | $150 |
| Temperature controlled | $125 |
| Flatbed / rigging | $175 |
What the number does not include
- Detention beyond free time — the consignee's clock and free-time terms are the carrier's; the rate confirmation states the free time quoted.
- Reweigh, reclass or redistribution — charged by the carrier when the freight does not match the class, weight or dimensions declared at booking.
- Storage, yard and per-diem — set by the terminal, port or warehouse, not by this desk.
- Customs, duties, ISF and foreign linehaul — a cross-border or ocean quote covers the US leg only unless the quote names the other leg.
- Anything added after tender — a line that is not on the rate confirmation is not charged without written approval.
A planning range is held for 7 days from issue. The rate confirmation states its own validity and the carrier tender window; those are the binding terms, not this page.
What moves the number
- Distance and lane — road mileage and regional capacity.
- Freight class and density — the NMFC class factor, verified at booking.
- Weight and pallet count — per-pound and per-pallet handling.
- Handling — liftgate, residential/limited access, appointment, inside delivery, hazmat, temperature, rigging.
- Pickup timing and carrier availability — the firm rate is confirmed in writing.
What we will not publish
No invented market averages, no competitor price claims, no “guaranteed lowest rate”, and no quotation of a rate we have not confirmed. If a number is not sourced from this site's model or data, it is not on this page.
Real data: the rate index
The rate index is computed from this site's own stored quotes with sample size and window shown, and withholds medians below n=5. Only stored quote requests are aggregated; medians are withheld below n=5.
Open the rate indexWhere to read next
- Freight accessorials explained — the published handling table and when each line applies — the same fixed amounts quoted on this page
- How freight class is derived, and how to document it — how density, handling and liability set the NMFC class that moves the rate
- Freight class is where LTL invoices go wrong — why most reclass fees are a documentation problem that starts at booking, not on the invoice