847shipments in transit
Portlandia Logistics
Portlandia Logistics

Our Projects

Real results from real projects across multiple industries

Case Studies

Real projects. Real numbers.

Energy
Residential Solar Installation - Phoenix, AZ
Challenge: Needed 42 solar panel systems delivered to homeowners across Phoenix metro over 6-week period. Previous freight broker had 8% damage rate and frequent delays.

Results:

Zero damaged panels

42 deliveries completed

98% within 2-hour window

On-time delivery

$4,200 vs. previous broker

Cost savings

15-20 systems/month

Repeat business

Healthcare
Emergency MRI Delivery - Miami Imaging Center
Challenge: $2.3M MRI machine and supporting equipment needed for facility opening. Time-sensitive delivery with only 3-day window due to construction delays.

Results:

$2.3M MRI delivered

Equipment value

Within 3-day window

Delivery time

Zero damage

Damage rate

2 medical centers

Referrals

E-Commerce
Furniture Brand National Distribution
Challenge: Online furniture retailer needed white-label final mile delivery for 200-300 orders/month with professional delivery, assembly, and debris removal.

Results:

280 orders/month

Monthly volume

4.8/5 rating

Customer satisfaction

94% on-time

On-time delivery

$85K/month

Revenue

Energy
2.8MW Solar Project - Texas Utility-Scale
Challenge: 2.8MW ground-mount solar project required 8,400 panels, 28 inverters, and racking for 50 acres. Phased delivery over 12 weeks to minimize on-site storage.

Results:

8,400 panels delivered

Equipment

1 week ahead of schedule

Timeline

Zero equipment damage

Damage rate

$18K vs. alternatives

Savings

Manufacturing
Production Line Relocation - KY to TN
Challenge: Electronics manufacturer moving production line from KY factory to new TN facility over one weekend. Target: minimize downtime to 48 hours.

Results:

12 machines, 85,000 lbs

Equipment moved

38 hours (beat target)

Actual downtime

Zero equipment damage

Damage rate

3-year distribution

Contract awarded

Restaurants
8-Location Chain Buildout
Challenge: Fast-casual restaurant chain opening 8 new locations in 4 months. Each location needed commercial kitchen equipment, furniture, POS systems coordinated with construction schedule.

Results:

52 deliveries, 190K lbs

Total deliveries

8 locations on schedule

On-time openings

2 locations opened early

Early openings

3-5 stores/year

Ongoing business